Harry Balfour Replacement School
Supply and Installation of Metal LockersHarry Balfour Replacement School, Grand Prairie, AB More info
Morinville, AB, Canada
2023
Sturgeon Public School Division
Morinville School identified the need to upgrade its current locker system to improve both functionality and aesthetics. After a thorough selection process, Xenali Inc. was chosen to lead this effort. Our expertise in delivering high-quality, visually appealing , long-lasting lockers aligns perfectly with the school’s goal to create a more organized, secure, and student-friendly environment
Over 200 Metal Lockers (over 400 doors) to support students and staff
Xenali assigned a team that consisted of dedicated project manager, and site-services manager to successfully deliver to our commitments.
Xenali’s responsibility included all procurement related logistics up to onsite delivery and installation.
Xenali committed to a JIT delivery at site. Our team was responsible to validating receipt of products, delivery to each of the floor-levels and for deployment into each of rooms.
Xenali utilized Project Management protocol to ensure safe operation of our team as well as safe coordination with the other trades that operated on site.
Using our Supply Chain Engagement model, Xenali incorporated various checkpoints, most relate to validation and revalidation. We revalidate design specifications, schedules, packaging/staging requirements, installation of materials, and validation of final installation layout. Pre-stage and post-stage documentation minimized rework, minimized impact to schedule and tracked deficiencies