Harry Balfour Replacement School
Supply and Installation of Metal LockersHarry Balfour Replacement School, Grand Prairie, AB More info
Grand Prairie
AMAN Builders
2020-2021
Grande Prairie School Division
Alberta Infrastructure
Aman Builders Inc.
Workun Garrick Partnership, Architecture and Interior Design Inc.
Grand Prairie (AB): Replacement of the existing Grande Prairie Composite High School, with the capacity to hold approximately 1250 students from grades 9 to 12 and a staff population of 108, upon completion. The school is a part of the Grande Prairie School Division. Total area of new construction 16,595 m2. Designed and constructed to LEED Silver standards.
Storage Specialties 10 51 00 – Metal Lockers -Supply and installation of metal lockers (Two, Three, and Four Tier Lockers)